Partners and References

  • JSC «Plant Kotloochistka» 
  • CJSC «Service Warehouse» 
  • NP «Energoremfond» 
  • LTD «Nevskaya metal company» 
  • LTD «Repair and Mechanical Plant» 
  • LTD «NPP« ARMS » 
  • LTD «Technoservice» 
  • LTD «Baltenergoservis» 
  • LTD «Baltenergostroy» 
  • LTD «Zapelektromontazh» 

We value the partnerships forged over many years, with our regular customers, suppliers and colleagues: 
JSC «Power Machines» 
JSC «Proletarsky Plant» 
JSC «GOZ« Obukhovskii Plant » 
JSC «Kirov» 
JSC «Baltic Plant» 
JSC «NGOs TSKTI» 
JSC «LTIs» 
SPbGTU (former LPI im. MI Kalinina) 
MEI 
IN OAO «Technopromexport» 
OJSC «Severstal» 
JSC «TGC-1», JSC «TGC-2», JSC «TGC-5», JSC «TGC-10», JSC "Yakutskenergo" 
JSC «OGK-1»: Top Tagil GRES, Nizhnevartovsk GRES, GRES Iriklinskaya, Perm GRES 
JSC «OGK-2»: Pskov GRES, GRES Stavropol, Surgut GRES-1 
JSC «OGK-4»: Berezovskaya GRES-1, Yayvinskaya TPP-16, Surgut GRES-2 
JSC «OGK-6»: Ryazan GRES, GRES Kirishskaya, Cherepovets GRES 
JSC «Sevzapelektrosetstroy» 
JSC «Vodokanal» (St. Petersburg) 
JSC «Kaunasenergoremont» 
JSC «Narva power plants» 
CJSC «Sevzapenergomontazh» 
CJSC «Energopribor» 
Vilnius CHP-3 
MEA East (Khabarovsk) 
MES Siberia (Krasnoyarsk) 
MEA Northwest (St. Petersburg) 
foreign companies Convertronic, AKZO NOBEL, ABB, Hawker-VARTA, Exide, Invensys, Nokian Capacitors, Benning, and others.
 

REFERENCES Ltd. "ETF" LENTURBOREMONT "

Object Name

Performed works

Period of works

Novgorod HPP-1

Overhaul the steam turbine PT-80/100- 130/13 The holding up of the regulatory system and steam distribution

1996

1997

JSC «Novgorodenergo»

Delivery of spare parts

1996-1998

Kalinin NPP

Repair equipment and supply spare parts

1996-1998

Arkhangelsk Region. Kotlas PPM

Supply and installation of stationary battery 
batteries

 

1996-2001

MEA East Khabarovsk

Comprehensive installation «turnkey» system operational AC / DC, batteries, uninterruptible power supply systems. Delivery of electrical equipment and spare parts.

1997-2001

MEA Volga, Samara

1997

MEA Siberia Krasnoyarsk

1996-2002

MEA Northwest, St. Petersburg

1998-2004

JSC «Lenenergo»

1997-2004

JSC «Yantarenergo»

1997- 2005

The Republic of Bulgaria

Delivery of spare parts turbines.

1997-2005

Finland, AEC Loviza

Delivery of spare parts for generators

1998

Republic of Lithuania

Vilnius CHP-3, together with the «Kaunasenergoremont» Technical Guide survey, major maintenance and upgrading of turbine unit T-180-130 Art. № 1 and № 2

1999-2002

Lithuanian TPP

Together with the «Kaunasenergoremont» 
Examination and issuance of recommendations for turbine unit K-300-240 Art. № 6
 

1998-1999

Kaunasenergoremont

Delivery of spare. parts for power plants:

  • Kaunas CHP
  • Mazeikiai TETs
  • Lithuanian TPP
  • Kruonisskaya NPP

 

1996–2001

Vilnius CHP-3

Supply c / o parts for turbines.

1998–2001

 

FSUE «VO« Technopromexport »

 

  • Manufacture and supply of oil lubrication systems and regulation, servomotors regulating stop valve for t / a K-300-240 TPP Ramin, Iran, Art. unit number 6. 
  • Secondment of experts to TPP «Kostolats» (Yugoslavia), to survey the turbine K-100-90 «Decision problematic technical issues associated with greatly reduced quantities of steam run RVD and RND in flowing parts»; 
    Plant «Gosh» Serbia and Montenegro «Technical guidance on the new disc oblopachivaniyu number of steps 26 and 30 p / t K-200-130 TPP« Nikola Tesla », de-RND rejected discs and nozzles for RND oblopachennyh new discs»; 
  • Secondment of a specialist in thermal power plants «Zhizhel» (Algeria) to survey the t / a K-215-130 and the vacuum density turbine unit; 
  • Secondment of specialist to the TPP «Hart» (Iraq) to survey the turbine power of 200 MW of firm «Mitsubishi» and issuing recommendations for repair work; 
    Delivery of spare parts for power plant Iran, Iraq, Yugoslavia, India, Bulgaria, etc.

     

 

1998-2005

Region of Krasnoyarsk Berezovskaya TPP

A survey of foundations and turbines K-800-240-5. Technical Manual Cap. repair t / as number 1 and the modernization of the M / unit. Delivery of spare parts.

1999–2001

Kazakhstan Ekibastuz GRES

Issuing recommendations for the modernization of K-500-240-4

1999

Lukoml TPP

The development project for the installation of the seal at the cellular level not rimed RCD number 23 and 24, the cellular production of seals and technical guidance to them during the installation of major repairs.

2000

JSC «Tyumenenergo» Surgutskaya GRES - 1 Surgutskaya GRES - 2 Tyumen TPP-1 Tyumen TPP-2

Projects of modernization and the inner end seal holder (fireplaces) low-pressure cylinder turbines T-180/210-130. Given the technical and commercial proposals for the improvement of performance characteristics of turbine units. 
Steam turbine K-800-240-5:

  • Manufacturing drives impellers for the last stages RND;
  • Blading disk impeller RND;
  • Delivery impeller assembly.
     

1999-2004

 

«Permenergo» Yayvinskaya TPP

Follow-up survey of the foundations of turbo sets K-160-130.

2001-2004

Cherepovets GRES

Survey the basement and the turbine unit, those. Book upgrading turbines K-200-130. Work performed in 1999-2002.:

  • installation of antifriction material under the hull front and middle of bearings without cutting HPC;
  • normalization efforts to HPC pipelines and IPC;
  • normalization of muscle-suspension system;
  • tightening of transverse bolt under body bearing medium;
  • tightening of exhaust parts and IPC, LPC;
  • testing to obtain authorization for an earlier shutdown TLU disconnect oil;
  • manual, modernizations turbines K-200-130, Art. Number 2 pre-push running RCD;
  • check the density of the vacuum system pressure steam without filling the vapor space of the condenser water;
  • reduction of leakage through the shaft oil seal using Survey the basement and the turbine unit, those. Book upgrading turbines K-200-130.

1999-2004

Pskov GRES

  • At turbines K-215-130, Art. Number 1 and 2, in 2001 made a significant amount of work during the period of maintenance, aimed at improving the operational characteristics. In 2002, the turbine unit at st. № 2 made major repairs to the significant amount of upgrading in the technical re-controlled Unified Energy System of Russia:
  • Full modernization paroraspredeleniya;
  • Modernization clip end seal (fireplaces) LPC;
  • Installation of a new toothed clutch with models between RVD and MDOU;
  • Installation of the improved current collection device of joint development;
  • Replacing the RCD and the number of nodes running parts.

Implementation of the electronic system of regulation and protection to the turbine unit K-215-130, station number 1 of the requirements of the order number 524 of RAO «UES» «Delivery sets of mechanical equipment, hardware ACS, adjustment and commissioning management system».

2001-2004

OJSC «Severstal» HPP-EMU-2

Chef-management major repairs turbine PT-80/100-130/13 Art. № 1

  • Work to control the axial channel of the rotor.
  • Carrying out works to adjust the output throat membranes, etc.
  • half-coupling reaming.
  • Delivery of oil repulsion coating to reduce leakage through the oil seals.

2003

Estonia, Estonian TPP

At turbines K-200-130, Art. № 7, № 6 and № 5 the following work:

  • normalization of the thermal displacements of the cylinders with the installation of antifriction material on the foundation frame, front and middle shells of bearings;
  • Normalization of pipelines and support-suspension system;
  • For turbines K-200-130. Art. Number 6 and number 5 on the bleeder to the NMP-4, and 3 installed bellows, the bleeder to the NMP-2 installed lens compensators, which removed the cross on the average cylinder pressure.
  • At the by-pass pipe from IPC to LPC installed upgraded compensators, which reduced the axial force of 7 tons for each tube.

 

2001-2004

«Kuzbassenergo» West Siberian Heat and Power Plant

Turbina PT-65/70-130/13 Art. Number 1

  • Removal of residual deflection RVD (radial battle in the area of regulatory steps 1, 2 mm) by use of a patent number 2079671 directly in a power plant.
  • Technical management major repairs;
  • Normalization of thermal expansion turbine;
  • Normalization of the pipelines and their support-suspension system.

2003-2004

Kirishskaya TPP

  • Production and delivery of a set of roofs with cellular repair seals not rimed stages CHSD turbines K-300-240;
  • Technical documentation for the implementation moisture trap in the last stages of low pressure (29.34, 39) turbines K-300-240-1, Art. Number 1;
  • The development of an optimal alignment through the shaft and the running of the period of repair of turbines K-300-240;
  • Manufacture and installation of easy connections to the coupling RVD-WG in the repair of the turbine P-50-130 Article number 6T;
  • Calculation of the strength of disks working turbine rotor blades, and R-50-130, susceptible to corrosion and parking recommendations for its restoration repair;
  • Development of measures for the normalization of the thrust bearing pads PTN turbines, turbine unit art. Number 2;
  • Repair by flushing oil coolers turbines K-300-240 Art. Number 2 and the turbine R-50-130 st. Number 6T;
  • Washing during overhaul oil turbine unit K-300-240 Art. Number 2;
  • Installation of additional flanges and fasteners in place pairing IPC - LPC turbines K-300-240.

2000-2004

 

Training with the issuance of state permits:

  • Training «Tyumenenergo»: «re- blading working stages, removal and attachment disk impellers»;
  • Training Pskov GRES optical method centering flow turbine parts;

2003-2005

Nizhnevartovskaya TPP

Turbine K-800-240-5, art. Number 2 Correction of residual deflection RCD (radial battle 0,41 mm) through the use of patent number 2079671 directly in a power plant.

2005

Armenia, Hrazdan TPP

Turbo C-200-130, Art. Number 1 and 4

Survey turbines of a coherent program, which includes the following sections:

  • Instrumental survey.
  • A survey of the foundation.
  • A survey of the pipelines and their support-suspension system.
  • 4 ... 6 experiments to verify the technical condition of turbines in different modes.
  • Static calculation of pipelines from the definition of load on the turbine cylinders on special techniques, taking into account developments pipelines.
  • Technical Manual repair.

2005

Surgut GRES-1 and Surgut GRES-2

Turbo C-210-130-3 (TPP-1) in the K-800-240-5 (GRES-2). Implementation of the electronic system of automatic regulation and protection in order to ensure quality management of primary frequency and power.

2005

IN Technopromexport» to the Serbian Republic

Turbine K-100-90-6.

  • Delivery of high-pressure cylinder, clip, diaphragms, shell front bearing, automatic gate valve boxes in the collection, management, and Sites steam distribution.
  • Completed development of 8 projects for the modernization thermal circuit and suction oil vapors from the shells and crankcases bearings.
  • The development project for the installation of antifriction Material (IFF) on the base frame building the front bearing and delivery of IFF.
  • Technical management major repairs turbine unit, repairs to the RND and the lifting disc re- blading 6 degrees

2006

Delivery of spare parts for Hydroelectric Power:

  • Irkutsk Hydroelectric Power Station;
  • Brother HPS;
  • Ust-Ilimsk HPS;
  • HPP «Таpka» - Syria;
  • Rybinsk HPP;
  • Kruonisskaya HEP - Lithuania.

1997–2005

Russia, CIS countries and abroad

 

Supply of spare parts for power equipment of thermal and hydroelectric power. Issuance of technical advice, the technical issues arising from the operation and maintenance of power equipment. Development of documentation for the modernization of the turbine equipment to enhance operational characteristics.

1996-2006

JSC "Quartz-Western Siberia"

Nizhnevartovskaya GRES, Surgutskaya GRES-1, TPP-2

  • Delivery of spare parts.
  • Upgrading mechanical-hydraulic control system of automatic regulation of turbine K-800-240.
  • Correction of the residual deflection of the rotor medium pressure directly under the station by using the Author invention.

2007

Iriklinskaya TPP

Delivery of spare parts kits re- blading, KKAZ

 2007

JSC Mosenergo TETs-12, CHPP-22

supply of spare parts, pillow bearing, Cyrus

  2007

Estonian TPP

 normalization of the thermal displacements of the cylinders with the installation of antifriction material on the foundation frame corps the front and middle of bearings, spare parts

2007

Uzbekistan, Novo-Angren TPP, Navoi TPP Fergana TPP, Syrdarya TPP ,Tashkent Thermal Power Plant

Delivery zapasynyh parts: diaphragm seals, control valves, s / p regulatory nodes automation parts cylinder WD, SD, ND, c / h inner bearings, s / p pressure regulators, clutch gear, c / h RC servomotors, diaphragm

 2007

 Pskov GRES  Delivery of the electronic system of regulation and protection. Installation and adjustment.

2007  

JSC "TGC-1" Pervomayskaya TETs Avtovskaya TETs, North CHP

 Repairs of turbines, pumps, valves

 2007

Zainskaya TPP Delivery systems of forced cooling of the steam turbine RCD RVD and K-200-130

 2007

 FGUP VO Technopromexport

Serbia TPP Kostolats "t / a K-100-90-6

  • Delivery of spare parts, installation supervision, supervision.
  • Algeria TPP Zhizhel "t / a K-210-130-3
  • Delivery of c / h management Bosnia and Herzegovina TPP "Tuzla" t / a K-200-130
  • A survey of the foundation, turbine unit, inside turbines pipelines and their support-suspension system.
  • A calculation of each pipeline.
  • Identified problems in t / a and issued specific proposals for addressing them. Bangladesh TPP Gorozal "
  • Delivery oil cooler

 2007

JSC Severstal t / a PT-60-130 Supply c / h steam distribution, kits of blading

 2008

JSC OGK-4 Smolenskaya GRES Delivery System ejector tube PE-3-700

 2008

JSC OGK-4 power plant Shaturskaya t / a K-200-130 delivery kits of blading

 2008

Iriklinskaya TPP t / a K-300-240 delivery kits of blading, guide vane

 2008

JSC "Quartz-Western Siberia" t / a K-800-240, TO-200-130 Delivery of spare parts management, paroraspredeleniya, block ZRS, summing block valve, RC servomotors, cylinder WA, SD, ND, diaphragm seals, kits of blading, sieves steam, valve AZ WA

 2008

JSC "NESKO" t / a T-180-210/130 supply guide vane, MDOU, of blading kits

 2008

JSC TGK-1 Pervomayskaya TETs Avtovskaya TETs North CHP

repair of turbines, pumps, valves

 2008

MEA Northwest FGC UES, Suoyarve FS, FS Sortavala, Kem FS, FS Medvezhegorsk  Supply of batteries, sheets of direct and alternating current. construction and commissioning work

 2008

OGK-6 OAO Ryazan GRES manufacture and supply drive RND t / a K-800-240

 2008

JSC Mosenergo CHP-27 Delivery of turbine oil TP-22s, Fyrquel-L

 2008

OAO "WGC-1" Upper Tagil GRES Reconstruction and high-pressure cylinder  intermediate-pressure cylinder block number 11, the introduction of ESRiZ. Dismantling, erection and start-up

 2008

JSC "Yakutskenergo" Manufacture and supply of spare parts. Engineering services and construction work.

2008  

The Republic of Armenia Hrazdan TPP. t / a K-200-130-1 Supply c / h steam distribution, diaphragm seals

2008  

Estonian Power Station generator TIA-220 Delivery of c / h generator and turbine K-200-130

2008

The Republic of Kazakhstan manufacture and supply of NGOs SUMKZ Energy oil cooler

 2008

Uzbekistan t / a K-300-240, TO-210-130-1, PT-60-130/13, AP-25-2 - the supply of spare parts, RC servomotors, flowing parts of cylinders WA, SD, ND, control valves , units of Automation, pressure regulators, diaphragm seals

 2008

Belarus Lukoml  TPP-supply filter TIA-320

  2008  

FGUP VO Technopromexport Algeria TPP Zhizhel

t / a K-210-130-3 supply diaphragm seals, spare parts Algeria TPP" Annaba "t / a K-50-90-4 delivery kits & blading, diaphragm

 2008

The Islamic Republic of Iran TPP Ramin.

Turbine K-300-240 st. № 3 Technical Manual refurbishment. Re- blading turnkey 11 degrees RVD, RCD, RND professionals Ltd "ETF" Lenturboremont. Customer Keyvan Khadem Co.

2008-2009 

JSC "WGC-1" Perm GRES Manufacturing impeller 8-step t / a K-800-240. Works on re-blading.

 2008-2009 

JSC "JAG-4" Shaturskaya TPP Manufacturing impeller 2-step t / a K-200-130. Works on re-blading.

 2008-2009

 In this reference specified only the most significant works and deliveries, realized by ltd. "ETF" Lenturboremont »during the period with 1996 on 2008г.


17.04.2009

The company has obtained the Certificate of compliance of System of a quality management (ISO 9001:2000)

15.01.2009
Lenturboremont” ltd secured the status of Technical agent of “Jakutskenergo”Corp
30.12.2008

“Lenturboremont” ltd. fulfilled preliminary specifications for works such as:
Change of К-200-130 turbounit parts and junctions, station №11 Verkhne-Tagilskaya ГРЭС

10.10.2008

The works have finished on the ПС 330 кВ КМСК