Энергетическое машиностроение и дополнительные услуги: ремонт турбин - ООО Инженерно-техническая фирма «Лентурборемонт»

Surveys and modernization

Program survey turbine unit. 
Performance of works of the adjustment systems turbine unit at the request of the customer. 
Improved end seal of low-pressure cylinder (fireplaces) 
Development of devices for manually rotating the rotors 
Measures to reduce electrolytic erosion for turbines. 
Turbo power 50-300 MW
Cell sealing steps with not rimed working vanes 
Engineering services to improve reliability and improve the operational characteristics of turbines 
PT-60-90, PT-60-130, PT-65-90 (130), PT-80-130 in service. 

Compaction of the rotary diaphragm. 
For the turbine K-200-130, TO-215-130 
Removal of erosion wear of the output edges of the upper tier level Bauman 
For the turbine K-300-240-3 TO-500-240-4, C-800-240-5 
Honeycomb seal for echelon of low pressure in the working vanes in integral smooth rim. 
For turbines with capacity 300-800 MW
Improving the maintainability, reliability and resource RCD by equipping intermediate-pressure cylinder of cooling system. 
Modernization of steam turbines with back pressure for the additional extraction of steam, the value of a negative change, and change the values of the existing selection. 
Improving the operating characteristics of steam turbines through the use of split transverse dowel, guaranteeing the free movement of the reference cylinder paws. 
Upgrading with an inner turbine oils directly to the oil wedge. 
Diagnosis of the state flow of high-pressure cylinder and intermediate-pressure cylinder during the operation. 
Automation of end injections to steam receiver device of turbine condenser. 
Reference Ltd. "ITF" Lenturboremont "in surveys and upgrading of turbines K-200

 


17.04.2009

The company has obtained the Certificate of compliance of System of a quality management (ISO 9001:2000)

15.01.2009
Lenturboremont” ltd secured the status of Technical agent of “Jakutskenergo”Corp
30.12.2008

“Lenturboremont” ltd. fulfilled preliminary specifications for works such as:
Change of К-200-130 turbounit parts and junctions, station №11 Verkhne-Tagilskaya ГРЭС

10.10.2008

The works have finished on the ПС 330 кВ КМСК

Ltd. “ETF"LENTURBOREMONT" is not responsible for the unauthorized use of any information contained in this site