Энергетическое машиностроение и дополнительные услуги: ремонт турбин - ООО Инженерно-техническая фирма «Лентурборемонт»

Technologies for network substations

• Complete accumulator plant• 24W • 48W • 60W • 110W • 220W • 400W from 100 ampere-hour to 3000 ampere-hour
• Charging - floating devices (rectifiers) 
• Inverters 
• voltage converter 
  The capacity of 1 kW to 220 kW 
• Uninterruptible power supply units (UPS) 
  The capacity of 1 kW to 300 kW 
• Complete transformer substations, including container type 
• Device reactive power compensation and harmonic filters 
• Complete system of OPT for a new generation of microprocessor systems 
• United power supplying installation of communication and Automatic control system of technological process 
• Systems for the protection of their own needs with microprocessor monitoring 
• Complete installation of frequency-controlled motor and soft start to control asynchronous motors. 

EMC (electromagnetic compatibility) solutions and protect the equipment from over voltages 

About batteries resource on energetic property

Photo of replacing AB on the substation Kingisepp 

Photos of projects

 


17.04.2009

The company has obtained the Certificate of compliance of System of a quality management (ISO 9001:2000)

15.01.2009
Lenturboremont” ltd secured the status of Technical agent of “Jakutskenergo”Corp
30.12.2008

“Lenturboremont” ltd. fulfilled preliminary specifications for works such as:
Change of К-200-130 turbounit parts and junctions, station №11 Verkhne-Tagilskaya ГРЭС

10.10.2008

The works have finished on the ПС 330 кВ КМСК